Supervision of works for reconstruction of defence embankment along the Sava Riv er in Srednja and Odzacka Posavina, FBiH, Bosnia and Herzegovina

Project details
Sectors Environment
EU Acquis Chapters Environment
EU funds 212 040 €
Implementation period 2018 - 2024
Categories
  •  Gender ;
  •  Climate action ;
  •  Digital ;
  •  Civil society

(Mouse hover to see significance)

Summary
The purpose if this project is supervision of works for reconstruction of defence embankment along the Sava River in Srednja and Odzacka Posavina, BiH.
Results
Implementation of this project will result in: - Upgrading the level of the existing embankment and achieving the required protective super-elevation. The subject of works have been in relation to the extension and superelevation to 1,2 m above the magnitude Q1/100 (one hundred year high water of the Sava River) of the embankment. - The total length of the Sava embankment covered by this reconstruction in Srednja and Odzacka Posavina is as follows: Component 1: Section 1.1. Kopanice – Vidovice (km 9+650 – km 15+196) = 5.546 m. - Section 1.2. Kopanice – Orasje (km 26+856 – km 29+370) = 2.514 m. - Total length of „Component 1“ is 8.060 m. Component 2: Section 2.1. Svilaj – Potocani (km 0+000 – km 1+1600 x 2) = 3.200 m. - Section 2.2. Svilaj – Kadar (km 22+272 – km 27+117) = 4.845 m. - Total length of „Component 2“ is 8,045 m.
Locations

Government level color legend

  • Fully funded project on only one level/location:
  • STATE
  • ENTITIES AND BRCKO DISTRICT
  • CANTONS
  • MUNICIPALITIES
  • Partially funded project on multiple levels/locations:
  • STATE
  • ENTITIES AND BRCKO DISTRICT
  • CANTONS
  • MUNICIPALITIES
Project is implemented at municipality level in:
Media
Images