Supply of equipment for the development of hydrological flood forecasting system for Sava River Basin in Bosnia and Herzegovina (Phase 1, Bosna River) Bosnia an d Herzegovina - Lot 4: Metheorological and Hydrological Stations

Project details
Sectors
EU Acquis Chapters Environment
EU funds 266 800 €
Implementation period 2018 - 2024
Categories
  •  Digital ;
  •  Gender ;
  •  Climate action ;
  •  Civil society

(Mouse hover to see significance)

Summary
This project is part of activities foreseen under IPA 2014 Special Measure for flood recovery and flood risk management. It addresses priorities under the BiH Action Plan for Floods Protection and River Management, adopted in 2015. A set of planned activities will serve to considerably upgrade the meteorological and hydrological observational network and strengthen measurement equipment capacities in BiH, specifically addressing Bosna River Basin and sub-basins of Ukrina, Tinja and Brka (all Sava River tributaries). The assistance planned includes supply of equipment including adequate software and hardware needed to improve capacities of the services involved (procured undrer 4 different lots). This particular contract, Lot 4 will provide meteorological and hydrologicals stations for the two Hydrometeorological Institutes (in FBiH and RS) and relevant service in Brcko District.
Results
Implementation of this project will result in: - Provided equipment and related trainings for the project beneficiaries (precipitation gauge stations, meteorological stattions, groundwater level measuring stations and hydrological stations). - Provided stations will considerably enhance the existing monitoring network and provide comprehensive measurements. - Beneficiaries are Hydrometeorologic al Institutes in FBiH and RS and relevant service in Brcko District.
Locations

Government level color legend

  • Fully funded project on only one level/location:
  • STATE
  • ENTITIES AND BRCKO DISTRICT
  • CANTONS
  • MUNICIPALITIES
  • Partially funded project on multiple levels/locations:
  • STATE
  • ENTITIES AND BRCKO DISTRICT
  • CANTONS
  • MUNICIPALITIES
Project is implemented at state level in:
Media
Images