Regulation of Brka River in urban area of Brcko District of BiH - Phase I

Project details
Sectors Environment
EU Acquis Chapters Environment
EU funds 1 133 433 €
Implementation period 2018 - 2024
Categories
  •  Civil society;
  •  Gender ;
  •  Digital ;
  •  Climate action

(Mouse hover to see significance)

Summary
Purpose of this porjetc is regulation of the Brka River, through the urban part of the city of Brčko, as an essential measure to improve flood protection of Brčko urban area. The Department for Agriculture, Forestry and Water Management of Brcko D. provided Detailed Design for the Phase 1 of the Brka River regulation. The subject of the works were the following sections: From P13 - Chainage 1+437.69 (end of the existing regulation section) To P32 - Chainage 2+148.21 (M3 Bridge - bridge at the beginning of Muse Cazima Catica Street), The length the Brka River regulation was L= 710,52 m. The channeled Brka River alignment is shortening the route of the natural riverbed, avoiding the large and deep meanders that are designed to be filled to suit the surrounding ground levels, using the selected excavated soil and drain materials. The upstream transition section is adjustment of the regulated cross section to the bridge structure and flow profile. Designed transverse concrete stabilisation sill provides riverbed and bridge structure stability.
Results
Implementation of this project will result in: - Improved flood protection infrastructure of the Brka River in the length L=710,52 m.
Locations

Government level color legend

  • Fully funded project on only one level/location:
  • STATE
  • ENTITIES AND BRCKO DISTRICT
  • CANTONS
  • MUNICIPALITIES
  • Partially funded project on multiple levels/locations:
  • STATE
  • ENTITIES AND BRCKO DISTRICT
  • CANTONS
  • MUNICIPALITIES
Project is implemented at region level in:
Media
Images