Technical Assistance in the Field of Animan By-Products and Animal Waste Managem ent in Bosnia and Herzegovina

Project details
Sectors Environment
EU Acquis Chapters Food safety, veterinary and phytosanitary policy, Environment
EU funds 1 613 150 €
Implementation period 2016 - 2024
Categories
  •  Gender ;
  •  Climate action ;
  •  Digital ;
  •  Civil society

(Mouse hover to see significance)

Summary
The purpose of the project is as follows: - Reduction of the risks to human and animal health, to environment, as well as increasing the economic potential of BiH. This project will also improve the ability of BiH to provide accurate statistical data on animal funds, as required by the EU. - Harmonised approach to the management of animal by-products across Bosnia and Herzegovina with feasibility study. The purpose is as follows: - Reduction of the risks to human and animal health, to environment, as well as increasing the economic potential of BiH. This project will also improve the ability of BiH to provide accurate statistical data on animal funds, as required by the EU. - Harmonised approach to the management of animal by-products across Bosnia and Herzegovina with feasibility study.
Results
Implementation of this project resulted in: - Animal By-products and Animal Waste Management Strategy for BiH (1st January 2019 to 31st December 2023), drafted and ready for adoption by the competent authorities of BiH with follow up activities for implementation of the Strategy defined (Overall Action Plan). The Overall AP covers responsibilities of all competent institutions in BiH, for the wide strategy priorities in the timeframe covered. This Action Plan is accompanied with four detailed implementation Action Plans, depending on all relevant budgets in BiH as follows: responsible BiH institutions, Federation of BiH and cantons, Republika Srpska and Brcko district BiH - Feasibility study for ABP/AW management drafted through comprehensive process with beneficiaries, which included complex analyses of management model, financial aspects, technological analysis, location analysis, transport routes, transportation means and collection networks, environmental, construction and architectural aspects of the construction of a facility for safe disposal of ABP/AW.
Locations

Government level color legend

  • Fully funded project on only one level/location:
  • STATE
  • ENTITIES AND BRCKO DISTRICT
  • CANTONS
  • MUNICIPALITIES
  • Partially funded project on multiple levels/locations:
  • STATE
  • ENTITIES AND BRCKO DISTRICT
  • CANTONS
  • MUNICIPALITIES
Project is implemented at state level in:
Media
Images