Design and studies for railway section Visoko – Konjic (resolution of Ivan - Bradina bottleneck)

Project details
Sectors Transport
EU Acquis Chapters Transport policy, Trans-European networks
EU funds 3 003 000 €
Implementation period 2020 - 2024
Categories
  •  Climate action

(Mouse hover to see significance)

Summary
The overall objective of the project is acceleration of activities on rehabilitation of the priority sections on the Core network, specifically Corridor Vc. The purpose of the project is increase of mobility and fostering of the cooperation with the EU, regional cooperation and economic development of BiH.
Results
The result shall assume completion of the set of documents required for tendering of works on reconstruction of the respective railway section, including: - Preliminary design, - Main design, - Related studies, and - Works tender dossier.
Locations

Government level color legend

  • Fully funded project on only one level/location:
  • STATE
  • ENTITIES AND BRCKO DISTRICT
  • CANTONS
  • MUNICIPALITIES
  • Partially funded project on multiple levels/locations:
  • STATE
  • ENTITIES AND BRCKO DISTRICT
  • CANTONS
  • MUNICIPALITIES
Project is implemented at municipality level in:
Media