Design and studies for betterment of road on South East Europe Transport Observa tory Route 2a, section Banja Luka¿ Ugar ¿ La¿va, Road section South end of Banja Luka Bypass ¿ Ugar (inter entity boundary line) ¿ Donji Vakuf

Project details
Sectors Transport
EU Acquis Chapters Transport policy, Trans-European networks
EU funds 3 150 000 €
Implementation period 2020 - 2024
Categories
  •  Climate action

(Mouse hover to see significance)

Summary
The overall objective of the project is acceleration of activities on rehabilitation of the priority sections on the SEETO Comprehensive Network. The purpose of the project is increase of mobility and fostering of the cooperation with the EU, regional cooperation and economic development of BiH.
Results
Implementation of this project will result in: - Completion of the set of documents required for tendering of works for the betterment/reconstruction/construction of the SEETO route 2a, represented by arterial/main roads M5 and M16, on sections Banja Luka – Ugar (IEBL) – Lašva. The outputs arising from this result shall include, but would not necessarily be limited to: - Review on compliance of the conceptual design with the relevant legislation and spatial plans of RS and FBiH, - Optimisation of alignment laid down in the phase of the conceptual design, including introduction of connections to the adjacent roads, and relocation of colliding road sections and buildings, - Prepared preliminary design for betterment, based on the conceptual design, - Prepared extract of documents for obtaining of the spatial conditions, and ultimately the spatial conformity for betterment/reconstruction/construction interventions, - Prepared feasibility study, - Prepared environment impact assessment, - Prepared road safety audit report, - Prepared main design for betterment / reconstruction / construction interventions, including interchanges, connections to the adjacent roads, and relocation of colliding road sections and buildings, - Revised main design by the contractor authorized for revision under the Laws of FBiH and RS, respectively, - Prepared tender dossier for construction of the respective betterment interventions, interchanges, connections to the adjacent roads, and relocation of colliding road sections.
Locations

Government level color legend

  • Fully funded project on only one level/location:
  • STATE
  • ENTITIES AND BRCKO DISTRICT
  • CANTONS
  • MUNICIPALITIES
  • Partially funded project on multiple levels/locations:
  • STATE
  • ENTITIES AND BRCKO DISTRICT
  • CANTONS
  • MUNICIPALITIES
Project is implemented at municipality level in:
Media