Provision of Terms of Reference for tenders in railway sector under IPA 2017

Project details
Sectors Transport
EU Acquis Chapters Transport policy, Trans-European networks
EU funds 19 488 €
Implementation period 2018 - 2024
Categories
  •  Civil society;
  •  Gender ;
  •  Climate action ;
  •  Digital

(Mouse hover to see significance)

Summary
The overall objective of the project of which this contract will be a part is as follows: To ensure closer integration between BiH and the EU in the transport sector, also contributing to connectivity agenda priorities. Purpose of this project is to provide for draft technical parts of the terms of references concerning: - technical assistance in institutional development of the BiH Railways Regulatory Board - preparing of preliminary studies and conceptual designs for overhaul of railway section Tuzla – Zvornik, including access to Tuzla International Airport.
Results
Implementation of this project resulted in: - Acceleration of activities on rehabilitation of the priority sections on the Core and the SEETO Railway Comprehensive Network, in particular along the Corridor Vc, and strengthening of the capacity of the railway regulator. - Enabled tendering for provision of technical assistance to support further institutional development of the BiH Railways Regulatory Board, - Enabled tendering for preparation of preliminary studies and conceptual designs for overhaul/reconstruction of railway facilities, including SS and telecommunications facilities, electrification and telecommunication facilities on the railway section Tuzla – Zvornik, including access to Tuzla International Airport.
Locations

Government level color legend

  • Fully funded project on only one level/location:
  • STATE
  • ENTITIES AND BRCKO DISTRICT
  • CANTONS
  • MUNICIPALITIES
  • Partially funded project on multiple levels/locations:
  • STATE
  • ENTITIES AND BRCKO DISTRICT
  • CANTONS
  • MUNICIPALITIES
Project is implemented at municipality level in:
Media
Images