Regulation of the Janja Riverband in Ugljevik - relaunch

Project details
Sectors Environment
EU Acquis Chapters Environment
EU funds 2 674 449 €
Implementation period 2018 - 2024
Categories
  •  Civil society;
  •  Digital ;
  •  Gender ;
  •  Climate action

(Mouse hover to see significance)

Summary
The aim of this project was “Regulation of the Janja Riverbed in Ugljevik” over a length of 3.7km, from the bridge to Old Ugljevik upstream to the new bridge next to Ugljevik Thermal Power Plant, as well as to regulate the mouths of creeks that flow into the Janja River on the left bank. A significant left tributary of the Jana River is the Laktenica creek at Ch. 1+174,79 m, and the two small creeks at Ch. 2+606,55 m and Ch. 3+698,60 m. The total designed length of regulation was 3.717 m. During the construction, it was necessary to shorten the regulation route twice, From P8-P18, in length of L=572m, and from P70-P76, in length of 208m. This project should built a stable riverbed of the Janja River, with the flow cross section formed in such a way as to ensure safe carrying of high water at a level occurring once in a hundred years p=1/100, and also to protect this part of riverbed from further erosion and destabilisation. The designed solution consists of the regulation of the minor riverbed, construction of protective defence embankments, expansion and deepening of the main riverbed.
Results
Implementation of this project will result in: - Improved flood protection infrastructure in Ugljevik Municipality. - The total length of constructed regulation is L 2937m on both banks, or a total of L=5874m (total length of the lower and upper longitudinal beams). - 47 transverse stabilization beams were constructed according to the design. - Recapitulated, the total length of cladding of riverbed (L=5874m), by its type is as follows: o Broken stone in concrete, L=150m o Broken stone, L=40m o Concrete prisms, L=1016m o Reinforced concrete slab, L=4668m - 3 structures for evacuation of littoral water were done. - 168 m of concrete pipes in diameter DN300-DN1000mm were installed in order to evacuate surface water from the existing streams and culverts to the regulated riverbed.
Locations

Government level color legend

  • Fully funded project on only one level/location:
  • STATE
  • ENTITIES AND BRCKO DISTRICT
  • CANTONS
  • MUNICIPALITIES
  • Partially funded project on multiple levels/locations:
  • STATE
  • ENTITIES AND BRCKO DISTRICT
  • CANTONS
  • MUNICIPALITIES
Project is implemented at municipality level in:
Media
Videos